Open the exception in context

Raise a numbered nonconformance (NCR-001, …) directly from the affected unit page—optionally tied to the failed routing step—and track all project exceptions from the Nonconformances register.

  • Record severity (Minor, Major, or Critical), observed condition, and private inspection photos or reports
  • NCRs move through Open, In review, Dispositioned, and Closed, with every lifecycle step preserved in the event history
  • Add a trace link from the NCR to a project risk when a unit defect points to a wider design or supplier issue

Review the exact disposition revision

Choose one of four dispositions—Rework, Use as is, Scrap, or Return to vendor. Every edit to the disposition creates an immutable revision so superseded instructions are never overwritten.

  • A Use as is disposition requires formal approval of that exact disposition revision in Reviews before the NCR can close
  • Editing the disposition after an approval request invalidates the older review so reviewers always sign off on the current wording
  • An approver must explicitly mark an NCR externally visible before it can appear on a customer build-record share

When the disposition is Rework, link the rework tasks required to restore the unit. TraceWorks enforces both closure and pass gates automatically:

  • A rework NCR cannot be closed until its linked rework tasks are done
  • A serialized unit cannot move to Passed in Manufacturing while it has any open nonconformance

Apply changes by serial effectivity

When an engineering change order introduces a mid-run fix, set the production run and optional starting serial number on the change order. Units from that serial number onward automatically display the effective change on their unit page and build-record PDF—and only approved changes effective for that run appear on customer shares.