Create the production context

A production run (PR-001, PR-002, …) tracks a series of physical units built against a product in your BOM. When you create the run, TraceWorks freezes a built-to baseline of the product, its components, vendors, and chosen specification revision, and generates all serialized units from your prefix, starting number, and padding.

  • Design records stay separate from unit builds: a failed inspection on a physical unit never alters the design-level requirement or test case
  • Set planned dates so the run also appears on the project Schedule
  • Runs with recorded installed-part genealogy cannot be deleted, keeping as-built history intact

Define the route

Build the ordered sequence of operations and inspections every unit in the run follows, or copy a routing from an earlier run to avoid rebuilding it from scratch.

  • Assign an optional owning department (station), work instructions, and planned duration to each step
  • Link an inspection step to a design-level test case—its acceptance criteria are snapshotted when the step is created so later edits never rewrite what this run inspected against

Record unit progress

As each unit moves through the route, record step results (Pending, In progress, Passed, Failed, or Skipped) with numeric measurements (value, unit, optional min/max), notes, and private evidence files.

  • Honest first-pass yield: if a step fails and later passes after rework, TraceWorks keeps the prior-failure flag so yield reporting stays accurate
  • Part genealogy: record installed component serial or lot numbers, vendors, and optional submittals on each unit; one serialized part cannot be installed in two units at once, and removals require a reason rather than deleting history

Review the build record

Open any unit’s serial number to inspect its complete internal build record: built-to baseline, routing and QC history, nonconformances, effective change orders, installed parts, and build timeline. A unit cannot move to Passed while it has an open nonconformance.

Download a unit's build record as a PDF from the unit page. It lists routing and QC history, nonconformances, applicable change orders, the run baseline, and installed parts. The Free plan includes three build-record PDFs per rolling seven days; Pro and Enterprise are unlimited (organization Viewers cannot export).

Share with customers

Choose Share with customers on a run or unit to give a customer read-only access to released sections of the record (see external recipient sharing). Managing shares needs manufacturing edit access and approval authority.

  • Enter exact recipient email addresses and an expiry of up to 30 days
  • Select the sections to release: built-to baseline, QC results, nonconformances, installed parts, and effective changes (QC results and NCRs must first be marked externally visible by an approver)
  • Pick individual evidence files; releasing a result does not release its attachments automatically
  • Copy the link, which is shown only once

Recipients confirm their email with a one-time code and read the record in a separate portal. They never join the workspace, and internal notes, comments, and commercial values stay private. Managers can see each recipient's access history and revoke a link at any time.