Platform · Manufacturing

Review each unit’s build history,
inspection results, and nonconformances.

Open a serialized unit to review its production run, completed operations, inspection results, and recorded nonconformances. Follow linked engineering records to understand the requirements and specifications behind the build.

From baseline to build

Review the operations and results recorded for a unit.

Check the planned route, completed operations, and inspection evidence for a serialized unit. Review unresolved quality issues before deciding whether it can move to the next step.

  • Production runs and generated serial numbers
  • Routing operations and inspection results
  • Quality evidence linked to the unit record
  • Release gates that account for unresolved work
Production run PR-008 / Unit build record

Pump skid PS-0025

In QC
Product baseline Rev 04Routing RT-002 / Rev 02
Assembly
Pressure test
03Final QC
04Release
Hydrostatic test evidenceLinked
NCR-003 · Valve supportReview required
CR-014 · Layout revisionEffective from PS-0027
Release depends on completed checks and resolved blockers.
Production and quality

Record inspections, rework, and applicable changes.

Define operations and inspections.

Define operations and inspection checkpoints. Record unit progress and the evidence behind each result.

Read about unit routing

Review nonconformance dispositions.

Govern NCR disposition revisions, approval decisions, and linked rework tasks against the affected unit.

Read about NCR control

Check changes by serial number.

Use serial-number effectivity to see which changes apply to a unit and keep the baseline context visible.

Read about change effectivity

Download the unit’s build record.

Each unit’s record lists completed operations, inspection results, NCR history, the run baseline, applicable change orders and installed parts. Download it as a PDF; evidence is listed by file name and revision. Free includes three build-record PDFs per seven days.

Read about build records

Record installed parts.

Record component parts by serial or lot, with vendor and submittal. A serialized part can be active in only one unit at a time, and removals are kept as history.

Read the manufacturing guide

Track yield per run.

First-pass yield, scrapped units, open nonconformances and schedule variance per production run, with CSV and XLSX export.

Read the manufacturing guide

Share released build records with customers.

Give named customer contacts read-only access to a run or unit. You choose the sections and evidence files to release and the expiry. Recipients confirm their email with a one-time code, never join your workspace, and lose access as soon as you revoke the link. Approvers decide which QC results and NCRs may leave the company, and an issued delivery package can be shared with the same customer contacts.

Connected delivery

Check the engineering baseline for the unit.

Run PR-008

Illustrative units
PS-0024Rev 04 · Pump skidPassed
PS-0025Rev 04 · Pump skidIn QC
PS-0026Rev 04 · Pump skidIn progress
PS-0027Rev 05 · Pump skidChange effective

Illustrative production run and unit states.

Engineers can review the unit’s baseline, planners can check its progress through the route, and quality reviewers can inspect the recorded results and open nonconformances.

  • Follow the product and specification baseline
  • Read inspection and nonconformance context
  • Keep rework and approval records connected
  • Review internal unit build records
  • MCP clients can read runs and build records under the same permissions

Walk through a unit’s production and quality records.

Request a walkthrough of unit routing, inspection results, nonconformance dispositions, and applicable changes.

Request a walkthrough