Write a useful requirement

State what the system must satisfy before prescribing how to build it. Each requirement records its title, description, type (Performance, Functional, Interface, Regulatory, Safety, Design criterion, Constraint, or Assumption), source (Customer, Regulatory, Internal, or Derived), priority, owner, acceptance criteria, and verification method.

  • Keep quantitative targets and units explicit (for example 500 units/hr) so verification and submittal checks have unambiguous criteria
  • Choose the verification method—Test, Inspection, Analysis, or Demonstration—while the intent is still fresh
  • Bring existing registers in via CSV bulk upload, document extraction, or ReqIF 1.2 exchange, where every imported item is reviewed before it enters the project

Connect the definition

A list of requirements becomes engineering traceability once each item is tied to the specifications, products, components, and tests that realize and prove it. Open the record drawer or the Trace canvas to maintain those trace links.

  • Link each requirement to the specification or numbered section that satisfies it
  • Connect downstream products, components, and I/O interfaces so impact analysis shows what a change affects
  • Tie at least one test case to each requirement; a requirement cannot move to Verified until a linked test has passed (see building a verification matrix)

Approve the baseline

Requirements move through Draft, Proposed, Approved, Implemented, and Verified (or Rejected and Archived). Approving a requirement establishes the governed baseline, locks in version history—including any custom fields enabled on the project—and makes it eligible for submittal baseline comparison.

Change an approved requirement

Approved requirements are never edited in place. Saving a change to an Approved, Implemented, or Verified requirement opens a requirement change request and routes it to Reviews while the approved baseline stays intact.

  • Reviewers inspect the exact old-to-new diff and can attach an advisory AI change-impact review before deciding
  • Changes to Safety or Regulatory requirements—or any requirement with a Regulatory source—always require an organization Owner or Admin to approve or bypass
  • Approving a change records a new version and marks passing tests on a Verified requirement Stale so they are re-run against the updated baseline
  • Bundle contractual or multi-record scope changes into a numbered engineering change order (CO-001) with optional cost, schedule, and serial-number effectivity