Start with the acceptance criteria
Every verification record should trace back to the requirement it proves and state the exact result that demonstrates compliance. Define the method early so teams know whether proof comes from a lab run, a drawing check, a calculation, or a witness event.
- Pick the verification method: Test, Inspection, Analysis, or Demonstration
- Write clear steps, expected results, and quantitative tolerances aligned with the requirement baseline
- Assign an owner responsible for running and recording the check
Connect the test
Create test cases in Tests and link each one to the requirements it verifies. As work progresses, a test case moves through Draft, Ready, Passed, Failed, Blocked, or Stale.
- Record a test run with notes and actual results, and attach the supporting evidence file directly to the test case
- Replacing an evidence file keeps the history in the activity log, naming the file that was replaced
- Reuse Inspection test cases as QC checkpoints inside a manufacturing routing—their criteria are snapshotted when the step is created so later edits never rewrite past inspections
Read coverage honestly
Linking a test case only shows that verification is planned; it does not prove compliance. TraceWorks enforces two safeguards so coverage stays trustworthy:
- Verification gate: a requirement cannot move to Verified until at least one linked test case has status Passed (authorized approvers may bypass with a written reason, recorded in the audit log; Safety and Regulatory items require an organization Owner or Admin)
- Automatic stale detection: when a Verified requirement changes, the daily sweep marks its passing tests Stale so they must be re-run before the requirement counts as verified again
Bring gaps into delivery
Review the verification matrix—a requirement-by-test grid with coverage counts and CSV export—alongside Trace Score and the coverage-gap report before design reviews and handover. Bundle signed test evidence into delivery packages once files reach Published status.