Tool · Serialized Build Records

Serialized build records and NCRs
linked back to the design baseline.

Connect production runs, serialized unit travelers, QC inspections, installed part genealogy, and nonconformance dispositions directly to the approved engineering specifications each unit was built against.

traceworks / execution / manufacturing / PR-001
TraceWorks Manufacturing production run PR-001 showing frozen built-to specification revision, 8-component bill of materials, unit progress, NCR register, and customer sharing

Live TraceWorks production run view: frozen built-to specification baseline, bill of materials, unit completion progress, NCR register, and controlled customer sharing.

Design baseline to unit handover

Know exactly what was built into every serial number.

Freeze a built-to baseline before launching a production run, route each serial number through shop operations and QC checkpoints, govern NCR dispositions and rework tasks, and export a complete build-record PDF or share selected sections with your customer.

  • Frozen built-to engineering baseline tied to every production run and serial number
  • Operation-by-operation routing, QC pass/fail evidence, and installed component lot/serial genealogy
  • Nonconformance reports (NCRs) with governed disposition revisions and linked rework tasks
  • Serial-number change effectivity and downloadable or securely shared customer build-record PDFs
Production run RUN-004 / Serialized unit

SN-0142 · High-pressure pump skid

Ready for handover
Built-to baseline · SPEC-018 Rev 04Frozen
Shop routing · OP-10 through OP-404/4 complete
Installed parts · Relief valve lot #RV-882Recorded
QC & NCR · Hydrostatic test + NCR-003 closedPassed

Sample unit dossier: routing, QC sign-offs, part genealogy, and approved NCR history compile into one build record.

Manufacturing traceability

Replace paper travelers and scattered inspection folders.

Unit routing & QC evidence

Track every serial number through assembly, calibration, and test operations with private inspection attachments streamed through authenticated downloads.

Read manufacturing docs

NCR disposition & rework governance

Open nonconformances directly against affected units, route disposition revisions through approvers, and require linked rework tasks to close before release.

Read NCR disposition docs

Serial-number change effectivity

Apply approved engineering change orders to specific serial ranges so production and quality teams always see which units incorporate the latest revision.

Explore manufacturing & quality

Controlled customer build sharing

Release approved QC results, installed parts, and selected evidence files via time-limited email-verified share links—keeping internal NCRs and commercial records private.

Read external sharing docs

Built for ISO 9001 and AS9100 delivery records.

TraceWorks links shop-floor verification and part genealogy directly to upstream customer requirements so final quality sign-off never requires manual binder assembly.

Evaluate serialized build records with your own product.

Explore the pilot production run inside the free sample sandbox or walk through unit routing, NCRs, and build-record PDFs with our team.

Request a walkthrough