Start by agreeing which part of the design the review will cover. Identify the requirements and components in scope, then ask the responsible owners to update their records before the meeting.
Check decisions and their rationale, risks and mitigation actions, assumptions awaiting validation, and requirements with missing specifications or verification. Record the questions that need a review decision.
What a review actually needs
- The decisions made since the last review, with rationale and alternatives considered.
- The open risks, scored by impact and probability, with mitigations and owners.
- The assumptions the design rests on, and whether they've been validated.
- Verification status: which requirements have a test, which passed, which are still open.
- Coverage gaps: requirements with no specification or no verification at all.
Review the relevant records in TraceWorks
In TraceWorks, use Decisions, Risks, Assumptions, and Tests to inspect the records relevant to the review. Follow trace links to check the supporting requirements, specifications, and evidence.
Use status and coverage reports to identify items that need attention. Assign follow-up tasks for gaps, and record decisions with their rationale so the outcome remains available after the meeting.
- Run Reports → Status for a print-friendly rollup of scope counts, execution KPIs, overdue tasks, and open risks.
- Run Reports → Coverage Gap to list requirements missing a specification or verification, and orphan interfaces.
- Filter Risks to open items above a severity threshold and confirm each has an owner and mitigation.
- Check the verification matrix for STALE tests — passing tests whose requirement changed since.
- Open the Trace canvas to follow a requirement’s linked specifications, components, and evidence.
What 'done' looks like
The review should leave a record of decisions, unresolved issues, assigned actions, and the evidence still needed. Keep those records current as the team completes the follow-up work.