Start with the product and component structure. Identify the specifications and requirements that each purchased component needs to address, then collect the relevant vendor records and quotes.

When a component or specification changes, review the linked quote and submittal as well. The relationship helps the team find the records to check; it does not replace a technical or commercial review.

Check relationships as well as supplier details

A supplier list alone does not explain which requirement a component addresses or which revision a quote covers. Recording those relationships gives reviewers a way to compare scope and identify records that need updating.

Link and review the supplier records

In TraceWorks, link components with their requirements, vendors, quotes, and submittals. Open the related records to compare the technical definition with what the supplier has offered.

  • Capture the product breakdown — products and their components, with system level and parent hierarchy.
  • Add vendors (org-wide or project-scoped) and the quotes they submit, with priced line items.
  • Link each component to its quote(s) and to the requirement(s) it satisfies via trace links.
  • Use the quotes compare view to evaluate competing packages per component side by side.
  • Tie components to submittals so the customer-facing delivery record stays connected to the part.

Review linked records for missing information and unresolved questions. Assign tasks for supplier clarifications, missing quotes, or submittal responses, and update the records when answers arrive.

What 'done' looks like

The result is a set of linked technical and supplier records that your team can inspect during procurement and design reviews. Recheck those records when a design, quote, or supplier selection changes.