Start with the supplier context
Register suppliers, fabricators, and subcontractors in Vendors with their contact details and status (Prospect, Active, Inactive, Blocked, or Archived). A vendor can be scoped to a single project or marked organization-wide so quotes, components, and installed parts can reuse it across projects.
- Narrowing an organization-wide vendor to one project is blocked while another project references it in a quote or installed part
- Connect vendors to the components they supply in the BOM tree so lead times and sourcing stay visible alongside technical definition
Compare the scope as well as the price
Quotes track vendor estimates and pricing with line items that automatically roll up into the quote total. Open Quote comparison to evaluate competing quotes for the same component side by side—checking line-item scope and specification revisions alongside price.
- Creating a quote revision copies valid lines and relations and expires the earlier revision so pricing history stays clear
- Awarding a quote accepts it and automatically writes an approved decision with your rationale to the project decision log
- Quotes, line items, and quote attachments stay hidden from organization Viewers (even when vendors and component lead times remain visible)
Prepare the submittal
Submittals package drawings, data sheets, and vendor responses with a package number, revision, reviewer, due date, and linked components. Moving a submittal to Approved requires an approved approval in Reviews (or an authorized bypass with a written reason).
To bring an existing submittal log across, import it from CSV (up to 1,000 rows): title, package number, revision, status, due date, and reviewer email. Rows whose package number and revision already exist are skipped and reported, and imported submittals start as drafts.
Keep the review history
Capture review comments, attachments, and disposition directly on the submittal. Statuses cover Draft, Submitted, In review, Approved, Approved with comments, Rejected, Revise and resubmit, and Archived. When revisions are requested, create a new submittal revision—it supersedes the earlier one while preserving the complete review trail.
Issue and confirm receipt
Download or save the submittal as a record PDF, with or without its PDF attachments (Pro and Enterprise), bundle it into an ISO 19650 transmittal or delivery package, and issue personal receipt links so each recipient confirms the exact revision they reviewed.
Check values against the baseline (Preview)
Upload a vendor submittal PDF (up to 100 MB and 300 pages) to extract grounded facts page by page and compare them against your project’s approved baseline—approved requirements, specifications, products, and components (drafts are never compared).
- Each finding reports
MATCH,MISMATCH,UNCLEAR, orNOT_ADDRESSEDwith severity, rationale, and a linked page image - High-severity (
HIGH) mismatches receive an independent second-model check against the cited page images before you review them - Starting a run pre-checks the package-wide token budget; if a provider rate-limits a batch, extraction pauses automatically and resumes without losing completed pages
- Confirming or dismissing a finding is strictly advisory and never alters a requirement, submittal status, or approval on its own
- After confirming a finding on the current revision, writers can explicitly post a confirmed
MISMATCHas a submittal comment or link a confirmed requirementMATCHas anEVIDENCEStrace link - Connected MCP clients can read verification findings and extracted facts through the read-only
getSubmittalVerificationtool under your project role