Use Case · EPC & Capital Construction Delivery

Governed RFIs, submittals, and
ISO 19650 transmittals for capital projects.

Coordinate owner requirements, design specifications, technical RFIs, supplier submittals, MS Project schedules, and controlled ISO 19650 delivery packages across engineering disciplines and external contractors.

traceworks / work / files
TraceWorks Files and Delivery Packages browser displaying ISO 19650 CDE states (Work in progress, Shared, Published), revision and suitability codes, and linked delivery packages

Live TraceWorks Files & CDE browser: filter project documents by record, CDE state, or delivery package with revision and ISO 19650 suitability codes visible.

Controlled capital-project delivery

Keep every discipline, contractor, and transmittal on the current revision.

Prevent field rework caused by superseded drawings or unanswered RFIs. TraceWorks links technical queries and vendor submittals to source requirements, enforces CDE states and suitability codes before issue, freezes SHA-256 transmittal manifests, and records explicit receipt confirmations.

  • Invite-only project access with page-level permissions per discipline or external organization
  • ISO 19650 Common Data Environment (CDE) states, suitability codes, and readiness checks
  • Frozen SHA-256 transmittal manifests with streamed downloads and personal receipt confirmations
  • Reviewed MS Project XML schedule imports with resource-to-department mapping and saved baselines
Capital delivery / Transmittal register

PKG-008 · Issued for construction package

Issued · 3/3 confirmed
CDE gate · All 12 files Shared / PublishedReadiness passed
Manifest · Frozen revision & SHA-256 hashImmutable
External RFIs · 2 contractor replies closedOfficial answer
Receipts · Owner & GC confirmed Rev 04Logged

Sample EPC transmittal: readiness gates, frozen file hashes, and explicit recipient acknowledgements stay together.

Built for EPC & project controls

Connect technical requirements with document control and schedule execution.

ISO 19650 delivery packages

Check every file for current revision, suitability code, and CDE state before freezing a transmittal manifest that newer revisions can never silently overwrite.

Read transmittal docs

RFI & submittal accountability

Keep external responders, official answers, submittal review cycles, and AI baseline verification linked directly to the affected requirements.

Explore RFI & submittal tracking

MS Project XML schedule alignment

Import and review MS Project XML schedules, map resources to departments, compare saved Gantt baselines, and link tasks directly to deliverables.

Read schedule import docs

External recipient portals without extra seats

Share RFIs and issued packages with named external email addresses using one-time verification codes, streamed private files, and full download audit trails.

Read recipient sharing docs

Viewed is not confirmed.

Opening or downloading a file never counts as acknowledgement—TraceWorks records an explicit confirmation tied to the person, revision, and document fingerprint.

Walk through an EPC document control and RFI workflow.

Explore the sample project or talk with our team about connecting your requirements, transmittals, and contractor workflows.

Request a walkthrough